Pay Attenion Please : Raw Materail cost is going up again, please make some inquiry before you placing the orders.
Place of Origin: | Guangdong of China |
Brand Name: | SPDAR , Hongfa |
Certification: | ISO9001:2008, AWS and BS EN ISO welding certificate by Singapore Setsco |
Model Number: | LSW |
Minimum Order Quantity: | 20 Ton or 1000 Square meter |
---|---|
Price: | Negotiable |
Packaging Details: | All steel members are put into one steel holder |
Delivery Time: | 15~45days |
Payment Terms: | T/T or L/C at sight |
Supply Ability: | 10000 metric ton/month |
Material:: | Q355B Or Q235B | Size:: | Customized |
---|---|---|---|
Design:: | PKPM, Tekla, Auto-Cad | Type:: | I Beam, H Beam, Hollow Section |
Bracing:: | D12 Rod, D20, D114*3.0 | Treatment:: | Hot-dip Galvanized Or Painting |
Connection:: | By Bolt Or Welding | Claddy:: | Single Panel Or Sandwich Panel |
Loading:: | 40HQ Or 40OT | Standard:: | GB, ASTM, BS |
High Light: | H Beam Warehouse Steel Structure,ASTM frame steel structure |
Larger Steel Structure Warehouse With Painting
Any Steel building can be fabricated:
Product Name | Customized prefabricated Steel Structure Building |
Place of Origin | Dongguan, Guangdong(China) |
Wind Resistance | Grade 12 |
Material | Q235B / Q355B |
Minimum Order | 100 Square Meters |
Package | Iron frame chassis, use HQ container OR OT container |
---What do our products can for?
Our products can do warehouse, workshop, storage shed, school, hanger shed, commercial building, high rise building, etc.
---How long can delivery?
Normally it needs around 45 days within 300 Tons when all drawing is confirmed.
---What’s the payment term?
30% deposit by TT when signing contract, 70% balance be paid by TT before shipment against final production material list.
---How to ship to job site?
Normally we use 40HQ, or 40OT.
---How about the erection?
We can provide 1 or 2 engineer supervise your erection if you need.
---Any others products can be supply?
All products about steel frame can be supplied, such as roofing sheet, wall panel, crane, door, window, down pipe and some accessories.
---Contact Information
Any questions, please contact Miss. Helen---008613712413260 --- helensun@hf-steel.com
Fire-Flaming Cutting
Auto-matic Welding
Organizing all steel parts into a steel holder before shipping
Contact Person: Ms. Anna Ye
Tel: 86-137 1241 0462
Fax: 86-769-86734545