Tel:
Hongfa Steel Structure Mats. Co., Ltd.
Hongfa Steel Structure Mats. Co., Ltd.

Pay Attenion Please : Raw Materail cost is going up again, please make some inquiry before you placing the orders.

 

Home ProductsWarehouse Steel Structure

Hot-dip Galvanized Prefabricated Warehouse Steel Structure Building

Hot-dip Galvanized Prefabricated Warehouse Steel Structure Building

  • Hot-dip Galvanized Prefabricated Warehouse Steel Structure Building
  • Hot-dip Galvanized Prefabricated Warehouse Steel Structure Building
  • Hot-dip Galvanized Prefabricated Warehouse Steel Structure Building
  • Hot-dip Galvanized Prefabricated Warehouse Steel Structure Building
Hot-dip Galvanized Prefabricated Warehouse Steel Structure Building
Product Details:
Place of Origin: DONGGUAN, GUANGDONG, CHINA
Brand Name: HongFa
Certification: ISO SGS
Model Number: H beam, C or Z sections purlins
Payment & Shipping Terms:
Minimum Order Quantity: 50 tons
Price: Negotiable
Packaging Details: Packed in a iron holder and then by a container, normally 15tons ~25tons per 40HQ container, loading quantity according to member's shape and length
Delivery Time: 15~45days
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability: 10000 metric ton/month
Contact Now
Detailed Product Description
Grade: Q235B; Q345B Purlin: C-section And Z-section
Surface: Painted Or Hot-dip Galvanized Dimensions: Customers' Requirement
Wall And Roor Panel: Rock Wool /PU/ EPS Sandwich/color Sheet Door: Sliding Or Rolling Door
High Light:

steel building warehouse

,

steel house frames

Hot-dip Galvanized Prefabricated Steel Structure Building For Warehouse

 

 

1. General Descriptionc


Garage Steel Frame /Steel Structure Rooms use pre-fabricated  steel H  beams to build the main steel frames and use  galvanized C & Z beams as the roof and wall purlin, cladding systerm can do the glass curtain wall , or aluminum curtain wall or use colored steel wall and roof , or can use FRP light tiles.
Quick to fabricate,Easy to assemble,
Long using time over 50 years,
Low cost and maintenance,
Environment friendly,
Recyclable,
Lighter weight,
Excellent anti-shock and anti-impact ability.
 
2. Material Specification Datas for reference
 

Hot-dip Galvanized Prefabricated Warehouse Steel Structure Building 0

 

 
3. Process method
 
CNC Steel plate cutting---- H Shape Forming ------ Welding By ARC Soldering Machine---- Straight/ Shape Fixing --- Joint Steel plate weld by manual--- Sand-blasting---- Paint Treatment Step----Loading Packing
 
4.Loading & Installation for reference
 
Loaidng in factory
Hot-dip Galvanized Prefabricated Warehouse Steel Structure Building 1
 
 
Loading at the project site


Hot-dip Galvanized Prefabricated Warehouse Steel Structure Building 2
 
 
Installation at job site
 
Hot-dip Galvanized Prefabricated Warehouse Steel Structure Building 3
 
 

 

5. Before sales service
 
We have professional engineer teams to make the structural drawing and building drawing according to customer's requirements.
If you are planing to build a Garage Steel Frame Building, please send your requirements to me, and then we can give you the best solution.
 

BUILDING  INFORMATION FORM
We will give you professional technical solution if you can fill this for and contact with us by e-mail, fax or tel which listed at the bottom of this form.
Compay Name:
Client   Tel/Fax:   E-mail:  
Building Basic Information
Project:   Project No.:  
Location   Building Usage     Total area  
Length
(m)
  Width
 (m)
  Eave Height
(m)
 
Roof material  
Wall material  
Design Load and Meteorological Conditions
Wind load
(kn/m2)
  Wind speed
(m/sec)
  Snow load
(kn/m2)
 
Rainfall
Capacity
  Earthquake Grade  
Please fill out the below information if your building has the mezzanine
Height of Mezzanine(m)   Usage of mezzanine  
Live load on mezzanine(kn/m2)  
Please fill out the below information if your building has the crane
Capacity
(t)
  Span
(m)
  Quantity  
Hoisting height (m)   Other information about crane  
Building sketch              

 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6. After- Sales
 
We can offer you the whole set installation drawings for assembly conduction.
 
Also we have professional installation teams, if you need , we can offer the installation engineers to help you to conduct the whole buildings installation.
 

Contact Details
Hongfa Steel Structure Mats. Co., Ltd.

Contact Person: Ms. Anna Ye

Tel: 86-137 1241 0462

Fax: 86-769-86734545

Send your inquiry directly to us
Hongfa Steel Structure Mats. Co., Ltd.
Shangjie Huangjinji Industrial Zone,Qishi Town,Dongguan,Guangdong,P.R. China 523501
Tel:86-769-86768228
Mobile Site Privacy PolicyChina steel house frames Supplier. Copyright © 2015 - 2022 buildingsteelframe.com. All Rights Reserved. Developed by ECER