Pay Attenion Please : Raw Materail cost is going up again, please make some inquiry before you placing the orders.
Place of Origin: | GUANGDOGN, CHINA |
Brand Name: | HONGFA |
Certification: | GB/ T19001-2016/ ISO9001:2015 |
Model Number: | HF030 |
Minimum Order Quantity: | 25tons |
---|---|
Price: | Negotiable |
Packaging Details: | Loose packing, by 40 HQ container |
Delivery Time: | 40days |
Payment Terms: | L/C, T/T |
Supply Ability: | 5000 metric tons per month |
Size: | Customize | Material Standard: | Q355B,Q235B |
---|---|---|---|
Main Frame: | H/ I Beam | Bracing Parts: | Angles/ Round Pipe |
Purline: | C/Z Galvainized Steel Purline | Roof & Wall: | Corrugated Steel Tiles |
Floor: | Galvanized Steel Floor Decking | Connection Accessories: | Common Bolts & High Strength Bolt |
Design Software: | PKPM/XSTEEL | Life: | 50 Years |
Usage: | Shopping Market | Installation: | Engineer Conduct |
High Light: | Q355 Steel Frame Buildings,Wind resistance Steel Frame Buildings |
Q355 Steel Frame High Buildings with 7 floors,Steel Shopping Market
Q355 Steel Frame High Buildings With 7 Floors
This type of builidings, use Box shape columns and H shape steel floor beams.
And use steel flooring of each mezzanine.
It is excellent for shopping markect or air-port lobby.
And other commercial builidings
Advantages
1. Stable and earthquake resistance
2. Wind resistance
3. Long using time up to 50 years
4. Sound insulation
5. Environment friendly: most of the excess materials can be recycled
6. Fast construction, time saving and labor saving
7. Lower cost and easy mainteance
Details
THE SPECIFIC GOODS USUALLY INCLUDED IN A PROJECT | |||
No. | Item | Description | |
Ⅰ | steel skeloton system | column,beam, roof bracing between rafter,bracing between column,roof and wall purline with sag rod,flange bracing | |
Ⅱ | fastening parts | anchor bolts,high-strength bolts,ordinary bolts | |
Ⅲ | roof and wall cladding system | roof and wall steel sheet,steel sandwich panel,heat-insulation materails,skylight,flashings and trims,gutter,downpipe,self-tapping screw,rivet,sealant,windows and doors etc. | |
Ⅳ | floor deck system | steel floor deck sheet,shear stud,steel edge formwork |
2. Process method
CNC Steel plate cutting---- H Shape Forming ------ Welding By ARC Soldering Machine---- Straight/ Shape Fixing --- Joint Steel plate weld by manual--- Sand-blasting---- Paint Treatment Step----Loading Packing
3.Installation Site
Fast- installation
4. Before sales service
Our excellent design team will design the satisfactory steel structure drawings for you if you give the following information.
1. Dimension: length, width, height
2. Area and local climate: wind speed, snow load, earthquake magnitude, etc.
3. Doors and windows: dimension, quantity, position
4. The materials on the roof and the wall
5. Crane need or not. if yes, please tell me the max lifting weight and max lifting height.
6. If you have other requirements,please also inform us.
7. It is better if you have your own drawings. please send them to me.
Main Structures in Container | |
Size | No longer than 11.8m |
Weight | 10~28 tons in each container |
Details | The heavy elements: loaded in 40ft OT or loaded in 40HC,40GP or 20GP with steel pallet by crane and forklift. |
The light elements: loaded in 40HC, 40GP or 20GP by hands. | |
Small parts: in bags or boxes in case lost | |
All the elements should be fixed or stable in the containers in case scratch or broken. |
Contact Person: Ms. Anna Ye
Tel: 86-137 1241 0462
Fax: 86-769-86734545