Pay Attenion Please : Raw Materail cost is going up again, please make some inquiry before you placing the orders.
Place of Origin: | DONGGUAN, GUANGDONG, CHINA |
Brand Name: | SPDAR |
Certification: | ISO |
Model Number: | 800square meter steel structure house- 1 floors |
Minimum Order Quantity: | 20tons |
---|---|
Price: | Negotiable |
Packaging Details: | Packed in a iron holder and then by a container, normally 15tons ~25tons per 40HQ container, loading quantity according to member's shape and length |
Delivery Time: | 15~45days |
Payment Terms: | L/C, T/T |
Supply Ability: | 10000 metric ton/month |
Steel Material Standard: | Q235B/Q345B; | Main Structure Parts: | Welded 6mm~25mm Thickness H Beams & Round Pipes |
---|---|---|---|
Bracing Parts: | 2.5mm Thickness Galvanized C Purlins & Steel Angles | Surface Treatment: | Red Primer + Grey Paint Surface |
Clading Systerm: | Colored Steel Sheet And FRP Lighting Tiles | Drainage System: | Galvanized Water Gutter & PVC Down Pipe |
Accessories: | High Strength Bolt & Self-tapping Screw | Loading: | By 40 HQ Contianer |
Installation Method: | By Bolt | ||
High Light: | farm buildings and structures,industrial steel structures |
Different Type Steel Skeleton Frame Light Gauge Steel Structures for Farm Sheds
1. General Description
Poultry Farm Structure / 800sqm Flower Shed use pre-fabricated steel H beams to build the maint steel frames and use galvanized C & Z beams as the roof and wall purlin, cladding systerm can do the glass curtain wall , or aluminum curtain wall or use colored steel wall and roof , or can use FRP light tiles.
Quick to fabricate,Easy to assemble,
Long using time over 50 years,
Low cost and maintenance,
Environment friendly,
Recyclable,
Lighter weight,
Excellent anti-shock and anti-impact ability.
2. Material Specification Datas for reference
Main Steel Frame | Column | Q235, Q345 / S275/ S355 welded H section steel/ Trusse Section |
Beam | Q235, Q345 / S275/ S355 welded H section steel/ Trusse Section | |
Secondary Frame | Purlin | Q235/Q345/ G450 C and Z purlin |
Knee brace | Q235B Angle Steel | |
Tie Rod | Q235B Circular Steel Pipe | |
Brace | Q235B Round Bar | |
Vertical and Horizontal Support | Q235B Angle Steel, Round Bar or Steel Pipe |
3.Process method
CNC Steel plate cutting---- H Shape Forming ------ Welding By ARC Soldering Machine---- Straight/ Shape Fixing --- Joint Steel plate weld by manual--- Sand-blasting---- Paint Treatment Step----Loading Packing
4.Loading & Installation for reference
Loaidng in factory
Loading at the project site
Installation at job site
5. Before sales service
We have professional engineer teams to make the structural drawing and building drawing according to customer's requirements.
If you are planing to build a Garage Steel Frame Building, please send your requirements to me, and then we can give you the best solution.
We will give you professional technical solution if you can fill this for and contact with us by e-mail, fax or tel which listed at the bottom of this form.
Compay Name: | |||||||
Client | Tel/Fax: | E-mail: | |||||
Building Basic Information | |||||||
Project: | Project No.: | ||||||
Location | Building Usage | Total area | |||||
Length (m) |
Width (m) |
Eave Height (m) |
|||||
Roof material | |||||||
Wall material | |||||||
Design Load and Meteorological Conditions | |||||||
Wind load (kn/m2) |
Wind speed (m/sec) |
Snow load (kn/m2) |
|||||
Rainfall Capacity |
Earthquake Grade | ||||||
Please fill out the below information if your building has the mezzine | |||||||
Height of Mezzanine(m) | Usage of mezzanine | ||||||
Live load on mezzanine(kn/m2) | |||||||
Please fill out the below information if your building has the crane | |||||||
Capacity (t) |
Span (m) |
Quantity | |||||
Hoisting height (m) | Other information about crane | ||||||
Building sketch | |||||||
|
6. After- Sales
We can offer you the whole set installation drawings for assembly conduction.
Also we have professional installation teams, if you need , we can offer the installation engineers to help you to conduct the whole buildings installation.
Contact Person: Ms. Anna Ye
Tel: 86-137 1241 0462
Fax: 86-769-86734545