Pay Attenion Please : Raw Materail cost is going up again, please make some inquiry before you placing the orders.
Place of Origin: | DONGGUAN, GUANGDONG, CHINA |
Brand Name: | SPDAR |
Certification: | ISO |
Model Number: | 100x20x8m Height Steel Structure Warehosue |
Minimum Order Quantity: | 20tons |
---|---|
Price: | Negotiable |
Packaging Details: | Packed in a iron holder and then by a container, normally 15tons ~25tons per 40HQ container, loading quantity according to member's shape and length |
Delivery Time: | 15~45days |
Payment Terms: | L/C, T/T |
Supply Ability: | 10000 metric ton/month |
Steel Material Standard: | Q235B/Q345B; | Main Structure Parts: | Welded 6mm~25mm Thickness H Beams & Round Pipes |
---|---|---|---|
Bracing Parts: | 2.5mm Thickness Galvanized C Purlins & Steel Angles | Surface Treatment: | Red Paint |
Clading Systerm: | Colored Steel Sheet And FRP Lighting Tiles | Drainage System: | Galvanized Water Gutter & PVC Down Pipe |
Accessories: | High Strength Bolt & Self-tapping Screw | Loading: | By 40 HQ Contianer |
Installation Time: | One Month | Installation Method: | By Bolt |
Application: | Warehouse/ Workshop | Design Software: | PKPM, TEKALa |
High Light: | prefab steel garage,galvanized steel frame |
Garage Steel Frame / Steel Warehouse / Red Color Steel Members-30000square meters
1. General Description
Garage Steel Frame / Steel Warehouse use pre-fabricated steel H beams to build the main steel frames and use galvanized C & Z beams as the roof and wall purlin, cladding systerm can do the glass curtain wall , or aluminum curtain wall or use colored steel wall and roof , or can use FRP light tiles.
Quick to fabricate,Easy to assemble,
Long using time over 50 years,
Low cost and maintenance,
Environment friendly,
Recyclable,
Lighter weight,
Excellent anti-shock and anti-impact ability.
Main component:
1 | Main steel frame | H section steel beam and columns, painted or Hot-dip galvanized |
2 | Secondary frame : | Hot-dip galvanized C/Z purlin, steel bracing, tie bar, knee brace, edge cover etc. |
3 | Roof panel : | EPS sandwich panel , glass fiber sandwich panel , rock wool sandwich panel , and PU sandwich panel or Single steel sheet |
4 | Wall panel : | Sandwich Panel or Corrugated Steel Sheet |
5 | Tie Rod: | Circular Steel Tube |
6 | Brace: | Round Bar |
7 | Knee Brace: | Angle Steel |
8 | Roof Gutter: | Color Steel Sheet or galvanized plate sheet |
9 | Rainspout: | PVC Pipe |
10 | Door: | Sliding Sandwich Panel Door or Rolling Metal Door |
11 | Windows: | PVC/Aluminum Alloy Window |
12 | Connecting: | High strength bolts |
13 | Packing: | There are a steel holder to support all steel members |
14 | Drawing: | We can make the design and offer according to your requirement or your drawing |
2. Material Specification Datas for reference
3. Process method
CNC Steel plate cutting---- H Shape Forming ------ Welding By ARC Soldering Machine---- Straight/ Shape Fixing --- Joint Steel plate weld by manual--- Sand-blasting---- Paint Treatment Step----Loading Packing
4. Loading & Installation for reference
Loaidng in factory
Loading at the project site
Installation a job site
5. Before sales service
We have professional engineer teams to make the structural drawing and building drawing according to customer's requirements.
If you are planing to build a Garage Steel Frame Building, please send your requirements to me, and then we can give you the best solution.
BUILDING INFORMATION FORM | ||||||||
We will give you professional technical solution if you can fill this for and contact with us by e-mail, fax or tel which listed at the bottom of this form. | ||||||||
Compay Name: | ||||||||
Client | Tel/Fax: | E-mail: | ||||||
Building Basic Information | ||||||||
Project: | Project No.: | |||||||
Location | Building Usage | Total area | ||||||
Length (m) | Width (m) | Eave Height (m) | ||||||
Roof material | ||||||||
Wall material | ||||||||
Design Load and Meteorological Conditions | ||||||||
Wind load (kn/m2) | Wind speed (m/sec) | Snow load (kn/m2) | ||||||
Rainfall Capacity | Earthquake Grade | |||||||
Please fill out the below information if your building has the mezzanine | ||||||||
Height of Mezzanine(m) | Usage of mezzanine | |||||||
Live load on mezzanine(kn/m2) | ||||||||
Please fill out the below information if your building has the crane | ||||||||
Capacity (t) | Span (m) | Quantity | ||||||
Hoisting height (m) | Other information about crane | |||||||
Building sketch |
6. After- Sales
We can offer you the whole set installation drawings for assembly conduction.
Also we have professional installation teams, if you need , we can offer the installation engineers to help you to conduct the whole buildings installation.
Contact Person: Ms. Anna Ye
Tel: 86-137 1241 0462
Fax: 86-769-86734545